2004-10-01


Previous Up Next
 

If you didn't get a chance to see the Hammock Fly, Check it out.

Clecoed the spar doubler to the spar and clecoed the hinge brackets in place. Match drilled the VS-410PP hinge bracket.

Clecoed the understructure together. VS-706, VS-707, VS-704, VS-705, VS-702 and VS-803PP.
Decided to cut in the lightening holes with the fly cutter..
Here they are, all cut. Kathryn is vacuuming up the large quantity of aluminum on the floor.
Smoothing the edge of VS-808PP spar doubler. Kind of late. I think I'll call it a day.